The method

Team Geometry.

A method to set up and run a small product team that ships with AI. It has four elements: Team, Rhythm, Cut and Chemistry. Each produces a one-page document the team keeps.

Team GeometryA blue square for the team, a red circle for the weekly rhythm, a yellow triangle for the cut, a black half-circle for the chemistry. To the right, the same four shapes at half size, twice: to grow, split into two small teams instead of growing one.TEAMWho, how many, who decidesRHYTHMOne decision a weekCUTWhat ships by the dateCHEMISTRYPeople and AI, togetherTO GROWTwo small teams, not one big one.
Square = Team. Circle = Rhythm. Triangle = Cut. Half-circle = Chemistry. To grow, start a second small team with all four.

How it works, in order.

  1. Week 1 · Team

    Set up the team

    Write the Team Charter: one outcome, one metric, one owner, 3 to 7 people, and who decides what.

  2. Week 1 · Chemistry

    Agree how people and AI work

    Write the AI working agreement: what AI drafts, what a person checks, what AI never touches.

  3. Week 1 · Cut

    Fix the date and draw the cut line

    Size every feature in weeks. What fits before the date is the MVP. Everything else goes on the waiting list, each item with a trigger.

  4. Every week, until the date · Rhythm

    Run the weekly rhythm

    Monday: frame one decision. Tuesday and Wednesday: prototypes in front of real users. Thursday: stakeholders sign the success criteria. Friday: decide and log it.

  5. On the date, then weekly

    Ship, then check the waiting list

    The MVP ships on the fixed date. A waiting-list item comes back only when its trigger is met, and then goes through the cut again.

  6. When the work outgrows one team

    Grow by splitting

    Start a second small team with its own charter, agreement, cut line and rhythm. Do not grow one team past seven people.

What the team gets
  • Team Charter
  • AI working agreement
  • Cut line + waiting list
  • Decision log

Four documents, one page each. The team keeps them and updates them.

The four elements.

Element 1 · Who, how many, who decides

Team

Who is on the team, what it is responsible for, and who decides.

  • One outcome, one metric, one owner, written down.
  • 3 to 7 people. The business owner is a member, not a guest.
  • No separate “AI team”. Everyone uses AI in their own work.
OutputTeam Charter (one page)
What AI doesDrafts research, specs and test cases, so the team can stay small.

Element 2 · One decision a week

Rhythm

The weekly routine that turns one open question into a written decision.

  • Monday: frame one decision. AI writes the brief and argues the other side.
  • Tuesday and Wednesday: AI builds two or three prototypes. Real users try them.
  • Thursday: stakeholders use the prototype and sign the success criteria.
  • Friday: decide, write it in the decision log, show what was built.
OutputDecision log + weekly demo
What AI doesWrites briefs, argues the opposite case and builds prototypes in hours.

Element 3 · What ships by the date

Cut

The decision about what is built before a fixed date, and what waits.

  • The date is fixed. The scope is what changes.
  • Features above the cut line are the MVP and ship on the date.
  • Features below it go on a waiting list, each with a trigger that brings it back.
OutputCut line + waiting list
What AI doesSizes options, maps dependencies and watches live data for triggers. A person makes the cut.

Element 4 · People and AI, together

Chemistry

How the people work together, and with AI.

  • A written AI working agreement: what AI drafts, what a person checks, what AI never touches.
  • Complementary skills: product, design, engineering, data.
  • People disagree openly, then commit to the decision.
OutputAI working agreement (one page)
What AI doesDrafts the agreement and flags unclear roles. People set the rules.

Element 3 · Cut

The cut line, explained.

The cut line separates what ships by a fixed date from what waits. The date decides where the line goes, not the wish list.

  1. List every feature someone wants, and size each one in weeks.

  2. Rank them: first what the product cannot work without, then what moves the agreed metric most.

  3. Fill the weeks before the date from the top of the list. Where the weeks run out, draw the line.

  4. Above the line is the MVP. It ships on the date.

  5. Below the line is the waiting list. Each item gets a trigger: a measurable condition, such as “sales answers 40+ quotes a week by hand”. An item with no trigger is dropped.

  6. Every week, check the triggers. When one is met, that item is sized and ranked again for the next date.

The rule: the date does not move. To add a feature to the MVP, move one of the same size to the waiting list.

How the cut line worksA list of features sized in weeks. The four that fit before the fixed date sit above a red cut line: they are the MVP and ship on the date. The four below the line are on the waiting list; each has a yellow triangle for its trigger, the condition that brings it back to be cut again.Sign inSearchRequest a quoteOrder statusCUT LINE = THE FIXED DATEAI quote repliesBulk uploadRolesDashboardsABOVE THE LINE: THE MVPFits before the fixed date.Ships on the date.BELOW: THE WAITING LISTEach item has a trigger ▲, a measurablecondition. When it is met, the item comesback and goes through the cut again.
Blue = in the MVP. Outlined = on the waiting list. ▲ = its trigger.

Try it: an 8-week example

A B2B self-service portal. Fixed date: 8 weeks from now. Select a feature to move it between the MVP and the waiting list.

6 / 8 weeksFits before the date

2 weeks spare. Keep them as a buffer for delays.

Checked: in the MVP, ships on the dateUnchecked: on the waiting list, with the trigger that brings it back

Is it working?

One check per element. Look at them every week.

Health checks for each element
ElementWorking whenBroken when
TeamAnyone on the team can name the outcome, the metric and who decides.The team grows before it ships.
ChemistryAnyone can say what they own, what AI may do, and what is off limits.People wait on AI, or AI waits on people, and nobody says so.
CutThe MVP fits before the date, and every item traces to the metric.The “MVP” has an admin console, five roles and a settings page.
RhythmAt least one logged decision a week, each with an owner and a metric.Meetings produce opinions, not decisions.

Five rules

The method on a sticky note.

  1. Small beats big.

    Before you hire, ask what AI can take off the team’s plate. Then hire for what is left.

  2. One team, one outcome.

    Two outcomes means two teams, or one outcome nobody owns.

  3. Decide every week, in writing.

    A decision that is not logged gets made again next month.

  4. Show a prototype, not a slide.

    People argue about slides. They react to prototypes. AI makes prototypes cheap.

  5. Fix the date. Cut the scope.

    Every deferred item gets a trigger. No trigger, no item.